Houghton Golf Club

This modern development was designed by Gentoo Construction. The tinted glass, along with the coloured aluminium profile, creates a modern look that sets this golf club apart from most courses in North East England.

Tyneside Golf Club

The last remaining pavilion golf club in North East England needed refurbishing - and we had to use materials to satisfy English Heritage.

Our brief was to develop a solution that would provide a more energy-efficient building keeping the original aesthetic appeal of the structure.

The existing single-glazed timber windows and timber-cladded fascias offered no insulation properties whatsoever. Our solution? We removed the existing cladding, introduced a high-performance insulating material between the joists and re-covered them with a fire-rated timber cladding. A breathable coating system was then applied to the external face with an exact colour match.

The single-glazed windows were replaced with new double-glazed timber windows. The original sightlines were kept whilst offering a higher performance and lower U-Value.

Fenham Baths

Fenham Pool in Newcastle upon Tyne has been an important community facility since 1938. After closure in 2003, the baths were re-opened in 2005 as a community-run pool. Following extensive refurbishment of the changing rooms on the back of a grant from the Big Lottery, we were awarded the contract to install high-performance glazing.  Due to the number of windows, including an impressive full-length skylight, the PVCu casement windows were introduced to ensure that warmth is retained as well as greater energy efficiency.

Warmseal Ltd, Westway Industrial Park, Throckley, Newcastle upon Tyne NE15 9HW